Your operation runs 24/7. The datacenters and buildings that house the equipment controls and electrical switchgear need to be robust to support those non-stop operations. With years of experience in the Oil & Gas industry supporting plant operators, we understand the requirements of these facilities and have a proven track record of success. We take ownership and work with your Engineering Service Providers and Construction teams to ensure the HVAC & Plumbing systems are designed and installed to meet your needs.

2022 | J. M. Gross Engineering | Construction & Commissioning

  • Oil & Gas critical facilities in Houston, TX

2019 - 2021 | Atlantic LNG | Engineering, Procurement & Construction

  • Train 2

    • Compressor Control Building

    • Loading Area Substation

    • Main Substation

    • Propane Condenser Substation

  • Train 3

    • Compressor Control Building

    • Loading Area Substation

    • Main Substation

    • Propane Condenser Substation

  • Train 4

    • Compressor Control Building

    • Loading Area Substation

    • Main Substation

    • Propane Condenser Substation

  • Shared Facilities

    • 15kV Substation

    • Marine Terminal Building (Jetty 2)

  • Thermal Oxidizer Electrical Building

Credits

Jabari George
Mechanical Engineer